|
|
Before
Constuction begins in previously unfinished basement. |
|
|
Frame constructed
Wall frame is built on floor and tilted into place. Insulation is on exterior walls. |
|
|
Framing
Framed walls are in place |
|
|
Ceiling
Frame is in place, ceiling gridwork has been installed and laser leveled in preparation for tile installation (by owner). |
|
|